(单选题)
The ()(吊货索套) at hatch No.1 is quite worn out.
Acargo light
Blashing wire
Ccargo sling
Dwire rope
正确答案
答案解析
略
相似试题
(单选题)
双杆作业卸货,若吊货钩已挂好货物,则两吊货索的操作顺序应为:() ①、松大关吊货索; ②、绞大关吊货索; ③、绞小关吊货索同时松大关吊货索; ④、松小关吊货索和大关吊货索
(单选题)
双杆作业卸货,若吊货钩已挂好货物,则两吊货索的操作顺序应为()。 Ⅰ松大关吊货索; Ⅱ绞大关吊货索; Ⅲ绞小关吊货索同时松大关吊货索; Ⅳ松小关吊货索和大关吊货索。
(单选题)
Put on ()(艇底塞) and hand the fender and the buoy.
(单选题)
Put in boat plug and hand the fender and the puoy.()
(单选题)
吊货索()
(单选题)
Rig the lifeboat ladder and safety net and report.()
(单选题)
Make fast the fore and aft ropes and lay out the embarkation ladder.()
(单选题)
The forecastle and the poop decks are a ship’s face and back.()
(单选题)
The forecastle and the poop decks are a ship’s face and back.()